Etisalat Telemisr – Egypt (2015)
In 2015, Lumera deployed a Delta Controls building management system (BMS) at the Etisalat Telemisr facility in Abou Rawash to automate key building systems and maintain 24/7 operational continuity. As a mission-critical telecommunications site for Etisalat Misr, the project required a highly reliable and efficient control system.
The Delta Controls solution enabled centralized system visibility, optimized HVAC performance, and ensured real-time environmental monitoring, all while reducing energy consumption. Designed for high-uptime environments, this deployment ensured uninterrupted operations and long-term infrastructure resilience.
This project reflects Lumera’s ability to implement robust BMS technology in telecom and data center facilities where downtime is not an option.