Etisalat Telemisr – Egypt (2015)

In 2015, a Delta Controls building management system (BMS) was deployed at the Etisalat Telemisr facility in Abou Rawash to automate key building systems and maintain 24/7 operational continuity. As a mission-critical telecommunications site for Etisalat Misr, the project required a highly reliable and efficient control system.

The Delta Controls solution enabled centralized system visibility, optimized HVAC performance, and ensured real-time environmental monitoring, all while reducing energy consumption. Designed for high-uptime environments, this deployment ensured uninterrupted operations and long-term infrastructure resilience.

Previous
Previous

UK Medical Implant Factory